loader image
Battersea Rainwater Recycling

Battersea Phase 3A, London

Battersea Phase 3, London

Commercial Rainwater Recycling system

Battersea Phase 3, London

Battersea Power Station is an iconic London landmark and one of the last major symbols of London’s industrial past. The redevelopment project brings both the Power Station building itself and the surrounding area back to life. The site will be easily accessible through an extension to the Northern Line.

Phase III creates ‘The Electric Boulevard’, which will be the main gateway to the 42-acre development, connecting the Northern Line Extension station with the Power Station. The phase includes more than 1,300 homes in a range of sizes and styles in two zones on either side of the boulevard, as well as a 160-room hotel, retail spaces, restaurants and leisure facilities.

Two of the world’s major signature architects are involved in this project; the building known as ‘O-1’ has been designed by Foster + Partners and the ‘RS-4’ buildings designed by Gehry Partners. ‘O- 1’ also includes a hotel, a clinic and affordable residential units. The scheme will be constructed in two phases. Phase 3A will be constructed whilst the new station is being built.

Aquaco designed, manufactured, supplied and installed a Rainwater recycling system which processes 7,000 Litres per day of Rainwater.

Request a Quotation

25 Churchill Place London

25 Churchill Place, London

25 Churchill Place, London

Commercial Greywater Multi Media Recycling system

michael j lonsdale

25 Churchill Place, London

25 Churchill Place, the last building to be built as part of the original masterplan for Canary Wharf, will be one of the most modern technology and energy-efficient office buildings on the Canary Wharf Estate.

Environmental features will include elevators that store and reuse energy elsewhere in the building, the latest ultra-efficient air-conditioning equipment that recycles the energy from exhaust air and photo voltaic cells to generate energy from the sun’s rays. The building will also have a ‘green’ roof, which enhances biodiversity and energy efficiency. 25 Churchill Place will achieve an ‘excellent’ BREEAM environmental performance rating and an Energy Performance Certificate (EPC) rating of 40 or better.

Aquaco designed, manufactured, supplied and installed a Greywater recycling system which processes 9,000 Litres per day of Greywater, plus a huge capacity of rainwater captured from the roof and sides of the building. This means has the capacity to recycle up to 3 million litres of grey water alone a year.

This project was completed in 2014 and Aquaco have been maintaining the systems since commission with our dedicated service team. 

Request a Quotation